Monday, December 29, 2008

Work Day at Hooper's

Kelly and Rick are going over the plans for the new crate and also providing Allysa and Jeremy some important safety pointers. Be sure to scroll through all the pictures to see the finished crate in the last picture.

Vic, in the gray sweatshirt, is giving Jeremy some welding instructions.

Chris and the other boys are getting pointers from Vic, too.

Peter is welding as his dad and Chris watch.

After getting instruction from Kelly, Allysa cut all the 2x2's to size for the crate.

After lunch break we played a version of our game with the RC cars. The weather was warm and sunny so we were able to play out on the driveway.

In the game, the teams used the cars to deliver items between the team members at opposite ends of the driveway. Here some of the players are waiting for mail to be delivered to their mailboxes.

Mia and Peter in a moment when he wasn't chasing after her.

Here is the gang with our new crate. A great big THANK YOU to Dennis for hosting our team for the work day.

2 comments:

  1. I second the THANK YOU to the Hoopers. It was great to be able to work in a well equipped, organized shop.

    IH

    ReplyDelete
  2. i wish i could have been their everyone looked liked they had a blast

    ReplyDelete